The Engineer House (Building No. 310) will be under mending construction during the period stated below.
Details
- Construction Period: 1 August ~ 10 August, 2007
- Construction Details: Painting walls inside the building and repairing the Fitness Center
- Personnel in Charge: Dean of College of Engineering (tel. 02-880-7006 or 7020)
- Cooperation Details:
· No one will be allowed to enter the building during the construction period.
· Dust can be produced due to the construction.
· The restaurant ‘Geumryong’ and the auditorium are unavailable during the construction.
Thank you for your cooperation.
- College of Engineering